A novel framework for integrating real-time optimization and optimal scheduling : Application to heat and power systems
The optimization of heat and power systems operation is a complex task that involves continuous and discrete variables, operating and environmental constraints, uncertain prices and demands and transition constraints for startups or shutdowns. This work proposes a novel methodology for integrating s...
Guardado en:
| Autores principales: | Serralunga, Fernán J., Aguirre, Pio A., Mussati, Miguel C. |
|---|---|
| Formato: | Objeto de conferencia |
| Lenguaje: | Inglés |
| Publicado: |
2014
|
| Materias: | |
| Acceso en línea: | http://sedici.unlp.edu.ar/handle/10915/41985 http://43jaiio.sadio.org.ar/proceedings/SII/10_Serralunga%20et%20al..pdf |
| Aporte de: |
Ejemplares similares
-
Energy-aware scheduling mandatory/optional tasks in multicore real-time systems
por: Méndez-Díaz, I., et al. -
Energy-aware scheduling mandatory/optional tasks in multicore real-time systems
por: Méndez Díaz, Isabel, et al.
Publicado: (2017) -
Upgrading evolutionary algorithms through multiplicity for multiobjective optimization in job shop scheduling problems
por: Esquivel, Susana Cecilia, et al.
Publicado: (2001) -
An algorithm for minimising due times violations in flexible package production scheduling
por: Ibáñez, Francisco S., et al.
Publicado: (2003) -
An improved ant colony algorithm for the job shop scheduling problem
por: Leguizamón, Guillermo, et al.
Publicado: (2002)