An algorithm for minimising due times violations in flexible package production scheduling
This paper includes part of the strategies used to solve a scheduling problem developed for a company that produces flexible packaging, presented in a quite general form though. In this problem it is necessary to schedule several jobs that involve four process and for each one of them there is a gro...
Guardado en:
| Autores principales: | Ibáñez, Francisco S., Díaz Araya, Daniel, Forradellas Martinez, Raymundo Quilez |
|---|---|
| Formato: | Articulo |
| Lenguaje: | Inglés |
| Publicado: |
2003
|
| Materias: | |
| Acceso en línea: | http://sedici.unlp.edu.ar/handle/10915/9464 http://journal.info.unlp.edu.ar/wp-content/uploads/JCST-Oct03-5.pdf |
| Aporte de: |
Ejemplares similares
-
A weight-based algorithm to deal with due dates in flexible package production scheduling
por: Ibáñez, Francisco S., et al.
Publicado: (2004) -
An algorithm to deal with due date violation in a multi-objective scheduling problem
por: Ibáñez, Francisco S., et al.
Publicado: (2003) -
An approach to solve scheduling problems with atrributes assoaciated to the activities
por: Ibáñez, Francisco S., et al.
Publicado: (2001) -
An improved ant colony algorithm for the job shop scheduling problem
por: Leguizamón, Guillermo, et al.
Publicado: (2002) -
Estrategias de búsqueda con criterios de selección que dependen de tablas de pesos asignadas a los recursos
por: Ibáñez, Francisco S., et al.
Publicado: (2000)