|
|
|
|
LEADER |
01371cam#a22003253a#4500 |
001 |
INGC-MON-06030 |
003 |
AR-LpUFI |
005 |
20221019003138.0 |
008 |
060510s1983 |||a fr||||| |0 0|eng d |
020 |
|
|
|a 0821302302 (v. 1)
|
020 |
|
|
|a 0021302310 (v. 2)
|
020 |
|
|
|a 0021302329 (v. 3)
|
080 |
|
|
|a 628.1
|
100 |
0 |
|
|a Grover, Brian.
|9 275361
|
245 |
0 |
0 |
|a Water supply and sanitation project preparation handbook
|
260 |
|
|
|a Washington :
|b The World Bank. The International Bank for Reconstruction and Development,
|c 1983.
|
300 |
|
|
|a 3 v. ilus. mapa tablas
|
440 |
0 |
0 |
|a The World Bank Te
|9 275362
|
505 |
0 |
|
|a V. 1. Guidelines; Grover. Brian;Annex 1. The Project Cycle; Baum. Warren C.;Annex 2. Project Data Sheet and Guidelines;V. 2 Case Studies. identification Report for Port City;Inmediate Improvement Project for Port City;Pre-feasibility report for Farmville;Pre-feasibility report for Port City; Grover. Brian;V. 3 Case Study. Feasibility Report for Port City; Grover. Brian
|
599 |
|
|
|a M3396 DON;M3397 DON;M3397 DON
|
650 |
1 |
4 |
|a AGUA
|9 264261
|
650 |
1 |
4 |
|a SUMINISTRO DE AGUA
|9 275363
|
650 |
1 |
4 |
|a INGENIERIA SANITARIA
|9 262822
|
929 |
|
|
|a M3396 DON;M3397 DON;M3397 DON
|
942 |
|
|
|c LIB
|6 _
|
959 |
|
|
|a MON
|
960 |
|
|
|a 6294
|
970 |
|
|
|a Registro convertido en forma automatizada
|
999 |
|
|
|c 6028
|d 6028
|
040 |
|
|
|a AR-LpUFI
|c AR-LpUFI
|